logo

SR 285 from SR 20 (John Sims Parkway) to south of SR 293 - Mid-Bay Connector Resurfacing

Sector: Bridge • Location: Niceville, Florida, United States Of America (USA)

Source: Florida Department of Transportation (FDOT)

Project
Construction

The Florida Department of Transportation will begin work in July on a $4.3 million construction project to mill and resurface a 2.2-mile segment of S.R. 285 from S.R. 20 (John Sims Parkway) to south of S.R. 293 (Mid-Bay Bridge Connector) in Okaloosa County. The project also includes:New sidewalks on the west side of S.R. 285 from Adams Street to College Boulevard.Signalization upgrades.Sidewalk en

Project Information FAQ

Project Information

4 Q
The project “SR 285 from SR 20 (John Sims Parkway) to south of SR 293 - Mid-Bay Connector Resurfacing” is an infrastructure initiative in the Bridge sector, located in Niceville, Florida, United States Of America (USA). Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Florida Department of Transportation will begin work in July on a $4.3 million construction project to mill and resurface a 2.2-mile segment of S.R. 285 from S.R. 20 (John Sims Parkway) to south of S.R. 293 (Mid-Bay Bridge Connector) in Okaloosa County. The project also includes:New sidewalks on the west side of S.R. 285 from Adams Street to College Boulevard.Signalization upgrades.Sidewalk enhancements including American with Disabilities Act (ADA) upgrades.Drivers may experience intermittent, temporary lane closures between 8 p.m. and 6 a.m. Lane closures and traffic impacts will not be permitted during holidays, special events, or home football games at C.W. Ruckel Middle School and Niceville High School. Pedestrians may be temporarily detoured while sidewalk work is performed.The project is estimated for completion in spring 2024.All activities are weather-dependent and may be delayed or rescheduled in the event of inclement weather. Drivers are reminded to use caution, especially at night, when traveling through a work zone and to watch for construction workers and equipment entering and exiting the roadway.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data