SR 285 from SR 20 (John Sims Parkway) to south of SR 293 - Mid-Bay Connector Resurfacing
Sector: Bridge • Location: Niceville, Florida, United States Of America (USA)
Source: Florida Department of Transportation (FDOT)
The Florida Department of Transportation will begin work in July on a $4.3 million construction project to mill and resurface a 2.2-mile segment of S.R. 285 from S.R. 20 (John Sims Parkway) to south of S.R. 293 (Mid-Bay Bridge Connector) in Okaloosa County. The project also includes:New sidewalks on the west side of S.R. 285 from Adams Street to College Boulevard.Signalization upgrades.Sidewalk en
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Florida Department of Transportation will begin work in July on a $4.3 million construction project to mill and resurface a 2.2-mile segment of S.R. 285 from S.R. 20 (John Sims Parkway) to south of S.R. 293 (Mid-Bay Bridge Connector) in Okaloosa County. The project also includes:New sidewalks on the west side of S.R. 285 from Adams Street to College Boulevard.Signalization upgrades.Sidewalk enhancements including American with Disabilities Act (ADA) upgrades.Drivers may experience intermittent, temporary lane closures between 8 p.m. and 6 a.m. Lane closures and traffic impacts will not be permitted during holidays, special events, or home football games at C.W. Ruckel Middle School and Niceville High School. Pedestrians may be temporarily detoured while sidewalk work is performed.The project is estimated for completion in spring 2024.All activities are weather-dependent and may be delayed or rescheduled in the event of inclement weather. Drivers are reminded to use caution, especially at night, when traveling through a work zone and to watch for construction workers and equipment entering and exiting the roadway. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
