logo

SR 293 @ DYKES CREEK 5.4 MI E OF ROME

Sector: Power Transmission • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

This project replaces the existing bridge on SR 293 bridge over Dykes Creek in Floyd County. The project will utilize an on-site detour and will have a construction duration of approximately 18 months.

Status
Under Construction
Sector
Power Transmission, Bridge, Power Generation (CCGT)
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 293 @ DYKES CREEK 5.4 MI E OF ROME

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “SR 293 @ DYKES CREEK 5.4 MI E OF ROME” is an infrastructure initiative in the Power Transmission sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project replaces the existing bridge on SR 293 bridge over Dykes Creek in Floyd County. The project will utilize an on-site detour and will have a construction duration of approximately 18 months.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Power Transmission, Bridge, Power Generation (CCGT)

Article published date

2026-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project