logo

SR-298 Drainage Structure Construction on Genesis Road

Sector: Road • Location: Crossville, Tennessee, United States

Source: 3B Media News

Project
Under Construction

Construction of a small drainage structure on SR-298 (Genesis Road) from LM 8.35 to LM 9.02 in Cumberland County. Both lanes are closed with a posted detour. Work includes culvert replacement and retaining wall installation.

Status
Under Construction
Sector
Road, Government, Waste Processing and Treatment
Location
Crossville, Tennessee, United States of America
Updated
22 Jul 2026
Source
3B Media News

ConstructChat

Ask ConstructChat about SR-298 Drainage Structure Construction on Genesis Road

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR-298 Drainage Structure Construction on Genesis Road” is an infrastructure initiative in the Road sector, located in Crossville, Tennessee, United States. Taiyo aggregates data on it from 3B Media News.

Participants

Sponsoring Agency

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction of a small drainage structure on SR-298 (Genesis Road) from LM 8.35 to LM 9.02 in Cumberland County. Both lanes are closed with a posted detour. Work includes culvert replacement and retaining wall installation.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Tennessee

City

Crossville

Source

Source

3B Media News

URL

More Details

Record type

Project

Sector

Road, Government, Waste Processing and Treatment

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project