SR-298 Drainage Structure Construction on Genesis Road
Sector: Road • Location: Crossville, Tennessee, United States
Source: 3B Media News
Construction of a small drainage structure on SR-298 (Genesis Road) from LM 8.35 to LM 9.02 in Cumberland County. Both lanes are closed with a posted detour. Work includes culvert replacement and retaining wall installation.
- Status
- Under Construction
- Sector
- Road, Government, Waste Processing and Treatment
- Location
- Crossville, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- 3B Media News
ConstructChat
Ask ConstructChat about SR-298 Drainage Structure Construction on Genesis Road
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a small drainage structure on SR-298 (Genesis Road) from LM 8.35 to LM 9.02 in Cumberland County. Both lanes are closed with a posted detour. Work includes culvert replacement and retaining wall installation. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Crossville |
Source
Source | 3B Media News |
URL |
More Details
Record type | Project |
Sector | Road, Government, Waste Processing and Treatment |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
