logo

SR 2/SR 515 FROM W OF SR 11 TO E OF EARL SHELTON RD - PH III

Sector: Car parking • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Rejected

Project is the widening and reconstruction of SR 515 & 2/US 76 in Union County from west of SR 11 in Blairsville to east of Earl Shelton Road. The total project length is approximately 4.39 miles and goes from mile post 9.54 to mile post 14.00 in Union County. This project consists of widening from a 3-lane rural section to a 4-lane divided rural section with a 32-foot depressed median. Within the

Project Information FAQ

Project Information

4 Q
The project “SR 2/SR 515 FROM W OF SR 11 TO E OF EARL SHELTON RD - PH III” is an infrastructure initiative in the Car parking sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

rejected

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Project is the widening and reconstruction of SR 515 & 2/US 76 in Union County from west of SR 11 in Blairsville to east of Earl Shelton Road. The total project length is approximately 4.39 miles and goes from mile post 9.54 to mile post 14.00 in Union County. This project consists of widening from a 3-lane rural section to a 4-lane divided rural section with a 32-foot depressed median. Within the City Limits of Blairsville, the proposed section is 5-lane urban with sidewalk. This project also includes 3 Special-Design retaining walls This project is Phase III of III, which has been split from the previous single PI 122900- SR 2/SR 515 from Blairsville to Young Harris after the May 2022 letting due to exceeding of the budgeted amount.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data