logo
ProjectConstruction Work Program

SR 3 @ CS 4/WEST PACES FERRY ROAD

One of 10,000+ projects Taiyo tracks in Georgia.

Source: Georgia Department of Transportation (GDOT)

The proposed improvement includes: Restriping to provide North Bound and South Bound dual left turn lanes on SR 3/Northside Pkwy and restriping under the I-75 overpass to provide two East Bound thru lanes and one East Bound right turn lane.

Status
Under Construction
Sector
Road
Location
Atlanta, Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 3 @ CS 4/WEST PACES FERRY ROAD

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “SR 3 @ CS 4/WEST PACES FERRY ROAD” is an infrastructure initiative in the Road sector, located in Atlanta, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Not available for this record.

Status

Original status

construction work program

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed improvement includes: Restriping to provide North Bound and South Bound dual left turn lanes on SR 3/Northside Pkwy and restriping under the I-75 overpass to provide two East Bound thru lanes and one East Bound right turn lane.

Location

Country

United States of America (USA)

State

Georgia

City

Atlanta

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Road

Article published date

2026-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project