logo
ProjectComplete

SR 3 @ PEACHTREE CREEK

One of 10,000+ projects Taiyo tracks in Georgia.

Source: Georgia Department of Transportation (GDOT)

The proposed roadway will consist of two 10-ft lanes, with a 10-ft two-way left turn lane & an 8-ft shoulder. The bridge section is proposed to be made of two 10-ft lanes, a 10-ft left turn lane, a 2-ft border, and a 5½-ft sidewalk on the western side of the bridge & a 5-ft border on the eastern side of the bridge. A new 15-ft wide utility/pedestrian bridge is part of this project. The utility/ped

Status
Closed
Sector
Car parking, Bridge, Power Transmission, Road, Government, Automotive, Power Generation (CCGT)
Location
Atlanta, Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 3 @ PEACHTREE CREEK

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 3 @ PEACHTREE CREEK” is an infrastructure initiative in the Car parking sector, located in Atlanta, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed roadway will consist of two 10-ft lanes, with a 10-ft two-way left turn lane & an 8-ft shoulder. The bridge section is proposed to be made of two 10-ft lanes, a 10-ft left turn lane, a 2-ft border, and a 5½-ft sidewalk on the western side of the bridge & a 5-ft border on the eastern side of the bridge. A new 15-ft wide utility/pedestrian bridge is part of this project. The utility/pedestrian bridge will be connected to a multi-use path along the eastern side of the bridge.

Location

Country

United States of America (USA)

State

Georgia

City

Atlanta

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Car parking, Bridge, Power Transmission, Road, Government, Automotive, Power Generation (CCGT)

Article published date

2024-05-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project