SR 3 @ PEAVINE CREEK 3.7 M E OF FT OGLETHORPE
Sector: Power Transmission • Location: Indian Springs, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project replaces the existing bridge on n SR 3/US 41/ US 76 over Peavine Creek in Catoosa County. The project will utilize an on site detour and will have a construction duration of approximately 18-24 months.
- Status
- Under Construction
- Sector
- Power Transmission, Power Generation (CCGT), Bridge, Government
- Location
- Indian Springs, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 3 @ PEAVINE CREEK 3.7 M E OF FT OGLETHORPE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project replaces the existing bridge on n SR 3/US 41/ US 76 over Peavine Creek in Catoosa County. The project will utilize an on site detour and will have a construction duration of approximately 18-24 months. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Indian Springs |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Bridge, Government |
Article published date | 2025-05-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
