logo

SR 3 @ SR 53

Sector: Road • Location: Calhoun, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

The proposed project will widen S.R. 53/Dixie Highway at S.R. 3/Fairmount to add left and right turn lanes in both directions. Also, the existing two-way slip ramps in the northwest & southeast quadrants will be reduced to one-way slip ramps allowing right turns from S.R. 3 to S.R. 53.

Status
Closed
Sector
Road, Government
Location
Calhoun, Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 3 @ SR 53

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 3 @ SR 53” is an infrastructure initiative in the Road sector, located in Calhoun, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project will widen S.R. 53/Dixie Highway at S.R. 3/Fairmount to add left and right turn lanes in both directions. Also, the existing two-way slip ramps in the northwest & southeast quadrants will be reduced to one-way slip ramps allowing right turns from S.R. 3 to S.R. 53.

Location

Country

United States of America (USA)

State

Georgia

City

Calhoun

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Road, Government

Article published date

2025-08-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project