logo
ProjectUnder Construction

SR 3 CONN @ CR 392/UPPER RIVERDALE ROAD

The status, timeline and source of this project. A free account opens every field.

Source: Georgia Department of Transportation (GDOT)

The project widens Upper Riverdale Road from the Tara Crossing shopping center traffic signal to SR 3/Tara Boulevard, improving the approach geometry from the existing configuration (left, through, through/right) to the proposed configuration (dual left, through, through/right). The project also adds a third northbound lane onto the SR 3/Tara Boulevard I-75 ramp for a distance of approximately 8

Status
Under Construction
Sector
Commercial, Road, Residential
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 3 CONN @ CR 392/UPPER RIVERDALE ROAD

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “SR 3 CONN @ CR 392/UPPER RIVERDALE ROAD” is an infrastructure initiative in the Commercial sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project widens Upper Riverdale Road from the Tara Crossing shopping center traffic signal to SR 3/Tara Boulevard, improving the approach geometry from the existing configuration (left, through, through/right) to the proposed configuration (dual left, through, through/right). The project also adds a third northbound lane onto the SR 3/Tara Boulevard I-75 ramp for a distance of approximately 825 feet from the intersection of Tara Boulevard and Upper Riverdale Road before beginning to merge back existing two-lane ramp. To accommodate the additional northbound ramp lane, the project will also widen the existing northbound approach geometry on Tara Boulevard (dual left, through, through/right) to the proposed configuration (dual left, dual through, through/right).

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Commercial, Road, Residential

Article published date

2026-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project