logo

SR 3 FM NORTHGATE DR TO PACES MILL RD; INC BRIDGE REPL- PH I

Sector: Road • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

This project has been split into two phases. Phase 1 now consist of replacing the existing bridge over the Chattahoochee River. The project will begin at Northgate Drive in Fulton County and end at Paces Mill Road in Cobb County. The existing bridge will be replaced with a new 109-ft 4-in wide structure which will match the typical section proposed in the original concept report - 3 lanes in ea

Project Information FAQ

Project Information

4 Q
The project “SR 3 FM NORTHGATE DR TO PACES MILL RD; INC BRIDGE REPL- PH I” is an infrastructure initiative in the Road sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project has been split into two phases. Phase 1 now consist of replacing the existing bridge over the Chattahoochee River. The project will begin at Northgate Drive in Fulton County and end at Paces Mill Road in Cobb County. The existing bridge will be replaced with a new 109-ft 4-in wide structure which will match the typical section proposed in the original concept report - 3 lanes in each direction with a 4-ft raised median, 17-ft multi-use path and 6-ft sidewalk. This project will not add capacity so as to conform to the 2010 model. Instead will have 2 lanes in each direction with auxilary lanes divided by a raised median. Phase 2 (the future project PI# 0009410) proposes to widen SR3/ US41 from 4 to 6 lanes with a 20-ft raised median and auxiliary lanes at major intersections. The proposed roadway section includes a 12-ft multi-use path and a 5-ft sidewalk.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data