SR 307 CONSTRUCT OVERPASS OVER NEW PORT AUTHORITY RAIL LINE
Sector: Automotive • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The project is located on SR 307 approximately 1,350-ft west of the intersection of SR 25/ US17 and SR 307 in Garden City, GA. This project is needed to provide a grade separation between rail and vehicular traffic. This proposal is for the construction of a bridge and approaches to carry SR 307 traffic over both the existing (Norfolk Southern) and proposed (Intermodal Facility) railroad tracks.
- Status
- Closed
- Sector
- Automotive, Commercial, Bridge, Rail, Seaport, Government, Manufacturing (Industrial)
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 307 CONSTRUCT OVERPASS OVER NEW PORT AUTHORITY RAIL LINE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is located on SR 307 approximately 1,350-ft west of the intersection of SR 25/ US17 and SR 307 in Garden City, GA. This project is needed to provide a grade separation between rail and vehicular traffic. This proposal is for the construction of a bridge and approaches to carry SR 307 traffic over both the existing (Norfolk Southern) and proposed (Intermodal Facility) railroad tracks. SR 307 presently has an at-grade crossing with the Norfolk Southern Foundation Lead track. In addition, six tracks are to be installed by the Georgia Ports Authority as part of the James D. Mason Intermodal Facility. The Intermodal Facility proposed build-out will have twenty tracks that will lie across the present location of SR 307. The grade separation will provide a much safer and more efficient movement of vehicles. The grade separation of SR 307 from the rail traffic was identified in the Chatham County Intermodal Freight study. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Automotive, Commercial, Bridge, Rail, Seaport, Government, Manufacturing (Industrial) |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
