SR 31 @ HOG CREEK TRIB 9 MI S OF PEARSON

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The project consists of the replacement of an existing bridge culvert on SR 31 @ HOG CREEK TRIB 9 MI S OF PEARSON in Atkinson County, located 9 miles south of the city of Pearson, GA. The proposed project begins approximately 1,450 feet northeast of the existing bridge culvert and extends southwest 1,450 feet, for an approximate length of 2,950 feet (0.6 miles). Proposed is a new bridge culvert th

Status
Under Construction
Sector
Bridge, Road, Government
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 31 @ HOG CREEK TRIB 9 MI S OF PEARSON

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 31 @ HOG CREEK TRIB 9 MI S OF PEARSON” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

construction work program

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of the replacement of an existing bridge culvert on SR 31 @ HOG CREEK TRIB 9 MI S OF PEARSON in Atkinson County, located 9 miles south of the city of Pearson, GA. The proposed project begins approximately 1,450 feet northeast of the existing bridge culvert and extends southwest 1,450 feet, for an approximate length of 2,950 feet (0.6 miles). Proposed is a new bridge culvert that will be constructed on the existing alignment. The proposed bridge culvert is to be embedded to provide proper aquatic organism passage, and the roadway profile will be raised to accommodate the larger structure size. The roadway typical section consists of two 12-foot lanes with a 4-foot paved shoulder and 10-foot total shoulder on each side of the roadway. Design speed of the project will be 55 mph. Traffic will be maintained on an off-site detour.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Bridge, Road, Government

Article published date

2024-05-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project