SR 34 @ CR 573/SHENANDOAH BLVD
Sector: Automotive • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The purpose of this project is to improve the safety and operation by the addition of a Type B median crossover at the intersection of SR 34/Bullsboro Dr. and Shenandoah Blvd. Currently, SR 34/Bullsboro Dr intersects Shenandoah Blvd. at a four-leg signalized intersection. The project will offset the East and Westbound center turn lanes on SR 34/Bullsboro Dr. providing better sight distance for ve
- Status
- Under Construction
- Sector
- Automotive, Road, Government, Manufacturing (Industrial)
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 34 @ CR 573/SHENANDOAH BLVD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of this project is to improve the safety and operation by the addition of a Type B median crossover at the intersection of SR 34/Bullsboro Dr. and Shenandoah Blvd. Currently, SR 34/Bullsboro Dr intersects Shenandoah Blvd. at a four-leg signalized intersection. The project will offset the East and Westbound center turn lanes on SR 34/Bullsboro Dr. providing better sight distance for vehicles in the left turn lane. The project improvements will take place in the existing grass median and will include replacing the existing traffic signal, signage, and striping within the project limits. The existing typical section is an urban four lane (12’ lanes) divided roadway with a +/50-foot grassed median,12’ left & right turn lanes with a 6' inside shoulders (2' Paved). The proposed typical section will have two 12' lanes in each direction with a 12' left (with 16ft gore) & right turn lanes in each direction. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Automotive, Road, Government, Manufacturing (Industrial) |
Article published date | 2024-03-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
