SR 34 @ SR 54
Sector: Road • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The proposed alternave would provide addional EB through lane along SR 34. The addional through lane would start as a NB Free Flow Right Turn at Fischer Rd and terminate as a drop right turn lane at Trinity Chrisan School Driveway (about 0.5 mi). The alternave would also provide signalized dual NBR and extend WBL by 400’ at the intersecon of SR 34 at SR 54. Addional works like earth work, s
- Status
- Under Construction
- Sector
- Road, Cement, Car parking, Automotive
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 34 @ SR 54
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed alternave would provide addional EB through lane along SR 34. The addional through lane would start as a NB Free Flow Right Turn at Fischer Rd and terminate as a drop right turn lane at Trinity Chrisan School Driveway (about 0.5 mi). The alternave would also provide signalized dual NBR and extend WBL by 400’ at the intersecon of SR 34 at SR 54. Addional works like earth work, signal cabinet and signal strain pole relocaon and ulity relocaon needs to be done for dual NBR construcon. To accommodate the addional through space 2 4 FT concrete medians would be proposed along SR 34. There would also be impacts to the sidewalk, pedestrian islands, and drainage structures that will be modi¿ed. Addional EB through lane would widen both inside and outside along SR 34 and that C &G & sidewalk would need to be rebuilt. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Cement, Car parking, Automotive |
Article published date | 2026-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
