SR 34 FM I-85 NB RAMP TO CR 1412/LAKESIDE WAY
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Georgia Department of Transportation (GDOT)
The proposed intersection improvement project would consist of the addition of auxiliary and turn lanes on SR 34 in Coweta County, approximately 2 miles east of downtown Newnan. The project limits would extend from the I-85 northbound ramp at M.P. 15.25 on SR 34, to M.P. 15.72, on SR 34 just west of Lakeside Way, for a project length of approximately 0.47 mile. The existing right turn lanes on S
- Status
- Closed
- Sector
- Road, Government, Manufacturing (Industrial)
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 34 FM I-85 NB RAMP TO CR 1412/LAKESIDE WAY
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed intersection improvement project would consist of the addition of auxiliary and turn lanes on SR 34 in Coweta County, approximately 2 miles east of downtown Newnan. The project limits would extend from the I-85 northbound ramp at M.P. 15.25 on SR 34, to M.P. 15.72, on SR 34 just west of Lakeside Way, for a project length of approximately 0.47 mile. The existing right turn lanes on SR 34 would be lengthened to provide auxiliary lanes for a total of three through lanes in each direction on SR 34 between the I-85 northbound ramps and the intersection with Newnan Crossing Boulevard. Additionally, the existing left turn lane from SR 34 westbound to Newnan Crossing Boulevard southbound would be expanded to dual left turn lanes. The left turn lane from SR 34 eastbound to Lakeside Way northbound would be lengthened to conform to AASHTO design standards. Newnan Crossing Boulevard on the south side of SR 34 would be widened to the east to add a second left turn lane from Newnan |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Government, Manufacturing (Industrial) |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
