SR 36 @ BIG SANDY CREEK 3.8 MI SW OF JACKSON
Sector: Bridge • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
Bridge Replacement of SR 36 at Big Sandy Creek. This structurally deficient triple-span steel culvert requires replacement due to scour undermining both the inlet and outlet, rust and corrosion throughout the culvert floor and walls with minor to moderate distortion in walls and floor and two of the three pipes have so much silt buildup, flow is completely restricted.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | construction work program |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Bridge Replacement of SR 36 at Big Sandy Creek. This structurally deficient triple-span steel culvert requires replacement due to scour undermining both the inlet and outlet, rust and corrosion throughout the culvert floor and walls with minor to moderate distortion in walls and floor and two of the three pipes have so much silt buildup, flow is completely restricted. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
