SR 36 @ SOUTH RIVER @ BUTTS-NEWTON COUNTY LINE
Sector: Bridge • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The purpose of the project is to replace the insufficient bridge while maintaining the existing horizontal alignment. An on-site detour will be utilized and will shift traffic 50 feet to the North of the existing bridge. The project will adequately handle future traffic needs within the existing typical section of two lanes.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The purpose of the project is to replace the insufficient bridge while maintaining the existing horizontal alignment. An on-site detour will be utilized and will shift traffic 50 feet to the North of the existing bridge. The project will adequately handle future traffic needs within the existing typical section of two lanes. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
