SR 368 @ PICKENS CREEK
Sector: Bridge • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The project proposes to replace the existing two lane bridge over Pickens Creek in Elbert County by utilizing an off-site detour. The project is located approximately 13 miles northeast of Elberton and is approximately 0.25 miles in length. The design speed is 55 mph and the typical section consists of two 12 ft. lanes with 6 ft. shoulders (2 ft. paved and 4 ft. grassed). The existing right of way
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project proposes to replace the existing two lane bridge over Pickens Creek in Elbert County by utilizing an off-site detour. The project is located approximately 13 miles northeast of Elberton and is approximately 0.25 miles in length. The design speed is 55 mph and the typical section consists of two 12 ft. lanes with 6 ft. shoulders (2 ft. paved and 4 ft. grassed). The existing right of way width is 80 ft. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Bridge projects in United States of America
- Silverado Canyon Road Bridge ( 55C - 0175 ) Replacement
- Modjeska Canyon Road Bridge ( 55C0172 ) Retrofit
- Application of the California Rapid Assessment Method on Strawberry Creek
- Nine Ten Place
- Clinton Keith Extension Project
- Chuckwalla Valley Road Bridge
- Jurupa Grade Separation
- Center St & Stephens Ave Resurfacing
