logo

SR 37; SR 45; CS 555/COURT ST & CS 560/WHITNEY ST @ 4 LOCS

Sector: Water Supply and Storage • Location: Morgan, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

SR 37; SR 45; CS 555/Court St & CS 560/Whitney St @ 4 LOCS: Inside the Morgan Downtown Square, Calhoun County, GA. The project will include the removal of 1200 sq.yd. of dilapidated sidewalk that was installed in the 40s. Once the existing 11.5’ sidewalk is demolished, new 8”x30” concrete curb gutter will be installed with a 2’ wide and 4” thick stamped concrete border and 9.5’ wide 4” thick concr

Project Information FAQ

Project Information

4 Q
The project “SR 37; SR 45; CS 555/COURT ST & CS 560/WHITNEY ST @ 4 LOCS” is an infrastructure initiative in the Water Supply and Storage sector, located in Morgan, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

SR 37; SR 45; CS 555/Court St & CS 560/Whitney St @ 4 LOCS: Inside the Morgan Downtown Square, Calhoun County, GA. The project will include the removal of 1200 sq.yd. of dilapidated sidewalk that was installed in the 40s. Once the existing 11.5’ sidewalk is demolished, new 8”x30” concrete curb gutter will be installed with a 2’ wide and 4” thick stamped concrete border and 9.5’ wide 4” thick concrete sidewalks. “V” gutter will be used on the north and east sides of the square due to grading issues. The total length of the project is approx. 1030’. The proposed sidewalk will include pedestrian lights and 4’x4’ cutouts for planting flowers and other small plants. Landscaping will be included for these cutouts. The sidewalk along SR 37 will include 2 bulb outs with handicap curb for ramps and crosswalks. A storm water drainage system will be installed under the sidewalks. No irrigation will be included in this project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data