logo

SR 383 @ I-20

Sector: Cement • Location: Martinez, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The proposed improvements involve adding a second SR 383 SB left turn lane onto the I-20 EB Ramps by removing the concrete median on the bridge and restriping all lanes to 11 ft. The I-20 EB entrance ramp will be extended to provide two receiving lanes for 500 ft with an additional 500 ft taper. A through-queue lane for the SR 383 SB left turn lane will be provided by removing the concrete median

Status
Under Construction
Sector
Cement, Road, Bridge, Manufacturing (Industrial), Government
Location
Martinez, Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 383 @ I-20

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 383 @ I-20” is an infrastructure initiative in the Cement sector, located in Martinez, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

construction work program

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed improvements involve adding a second SR 383 SB left turn lane onto the I-20 EB Ramps by removing the concrete median on the bridge and restriping all lanes to 11 ft. The I-20 EB entrance ramp will be extended to provide two receiving lanes for 500 ft with an additional 500 ft taper. A through-queue lane for the SR 383 SB left turn lane will be provided by removing the concrete median immediately north of the I-20 WB Ramps. Flexible posts will be installed to the outside of this new lane. In addition, an SR 383 NB through-queue lane for the NB left turn lane onto I-20 WB will be added by restriping the SR 383 lanes between the I-20 EB Ramps and Belair Frontage Road.

Location

Country

United States of America (USA)

State

Georgia

City

Martinez

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Cement, Road, Bridge, Manufacturing (Industrial), Government

Article published date

2025-07-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project