SR 385/US 441 BUS @ SR 17/SR 197
Sector: Commercial • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The proposed improvement would modify and combine the existing signalized intersection on SR 17 and SR 385 Business and the four way stop intersection on SR 17 and SR 197 into one 4 leg signalized intersection with necessary turn lanes and pedestrian facilities.
The need for the project is to eliminate the existing signalized intersection of SR 385 Business & SR 17 in entirety and relocate the
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | long range program |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed improvement would modify and combine the existing signalized intersection on SR 17 and SR 385 Business and the four way stop intersection on SR 17 and SR 197 into one 4 leg signalized intersection with necessary turn lanes and pedestrian facilities. The need for the project is to eliminate the existing signalized intersection of SR 385 Business & SR 17 in entirety and relocate the signalization to the reconfigured four way stop intersection of SR 17 & SR 197. In the current configuration there is a distance of only 275 feet between the two intersections. By relocating the signal and eliminating the second intersection it will add to the overall operation and safety of three intersecting SR corridors at this location. This project is listed in the Final Report of a Multimodal Transportation Study completed by our Office of Planning in July 2003. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Commercial projects in United States of America
- 2023 Citywide Pedestrian Safety Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
- FCS Child Care Project
- Brotman Hall (BH) Suite 377 Renovation
- Fine Arts and Housing Cooling Engineering Study
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
