SR 38/US 84 FROM PEAGLER CROSSING ROAD TO FIRE TOWER ROAD
Sector: Road • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
0012845 proposes to widen US84/SR38 from 2 to 4 lanes with a 32-foot depressed, grassed median. The proposed alignment follows the existing highway for the length of the project. The project begins at Peagler Crossing Road and ends at Fire Tower Road. This project is alo twinned with 522770.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | 0012845 proposes to widen US84/SR38 from 2 to 4 lanes with a 32-foot depressed, grassed median. The proposed alignment follows the existing highway for the length of the project. The project begins at Peagler Crossing Road and ends at Fire Tower Road. This project is alo twinned with 522770. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
