SR 3/US 19 @ SR 138
Sector: Cement • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The proposed operational improvement project would consist of improvements at the intersection of SR 3/US 41 Tara Blvd and SR 138. This project proposes to widen SR 138 EB and WB to accommodate dual left turns and exclusive right turn lanes with a concrete median from SR 3 to Gross Road Pkwy (eastbound approach). This project will remove the split phase signal and convert to standard signal phas
- Status
- Under Construction
- Sector
- Cement, Road, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 3/US 19 @ SR 138
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed operational improvement project would consist of improvements at the intersection of SR 3/US 41 Tara Blvd and SR 138. This project proposes to widen SR 138 EB and WB to accommodate dual left turns and exclusive right turn lanes with a concrete median from SR 3 to Gross Road Pkwy (eastbound approach). This project will remove the split phase signal and convert to standard signal phasing. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Government |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
