SR 3/US 19 @ SR 32
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
The project is located in the downtown business district of Leesburg. The affected areas are the west side of US 19/SR 3, The east side of US 19/SR 3/SR 32, the north and south side of SR 32/4th Street, along the east side of the northbound lanes of SR 32/Main Street from SR 32/4th Street, continuing east along the north side of SR 32/Main Street and the existing paved median between the Courthous
- Status
- Under Construction
- Sector
- Car parking, Road, Government, Automotive
- Location
- Leesburg, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 3/US 19 @ SR 32
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is located in the downtown business district of Leesburg. The affected areas are the west side of US 19/SR 3, The east side of US 19/SR 3/SR 32, the north and south side of SR 32/4th Street, along the east side of the northbound lanes of SR 32/Main Street from SR 32/4th Street, continuing east along the north side of SR 32/Main Street and the existing paved median between the Courthouse Avenue one-way pair travel lanes in front of the Lee County Courthouse. It proposes constructing, new public parking, ADA compliant five-foot-wide sidewalk, curb and gutter, and greenspace. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Leesburg |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Government, Automotive |
Article published date | 2024-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
