SR 3/US 19 FM CR 201/COOPER RD TO BUTLER BYPASS & NEW LOC
Sector: Road • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project is the widening and reconstruction of US 19/SR 3 from just south of CR201 (Cooper Road) to the Butler Bypass for a total of 10.2 miles. The existing roadway consists of two lanes with rural shoulders on 100 ft. of existing right-of-way. The existing major structures are: (1) CSX Railroad Bridge, and the Whitewater Creek Bridge. This project is part of the Governor's Road Improvemen
- Status
- Closed
- Sector
- Road, Power Transmission, Power Generation (CCGT), Bridge, Rail, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 3/US 19 FM CR 201/COOPER RD TO BUTLER BYPASS & NEW LOC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is the widening and reconstruction of US 19/SR 3 from just south of CR201 (Cooper Road) to the Butler Bypass for a total of 10.2 miles. The existing roadway consists of two lanes with rural shoulders on 100 ft. of existing right-of-way. The existing major structures are: (1) CSX Railroad Bridge, and the Whitewater Creek Bridge. This project is part of the Governor's Road Improvement Program (GRIP). The posted speed is 55 mph and the design speed is 65 mph. The proposed construction will provide four 12 ft. lanes with a 44 ft. depressed grassed median for the entire project length. The proposed right-of-way varies from 250 ft. to 300 ft. Approximately 99% of the existing roadway requires reconstruction. Three new parallel bridges will be constructed over the CSX Railroad, Rambulette Creek, and Whitewater Creek. The existing bridges are located in sections of existing roadway requiring vertical and horizontal alignment changes; therefore, they will not be utilized. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Power Transmission, Power Generation (CCGT), Bridge, Rail, Government |
Article published date | 2025-05-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
