logo

SR 3/US 19 FM CS 3498/MARIETTA STREET TO CS 3352/8TH STREET

Sector: Bridge • Location: Atlanta, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The proposed project would construct a new Northside Drive to provide two northbound and two southbound travel lanes from south of Marietta Street to 8th Street with improved intersections at Marietta Street and Tech Parkway. The project is approximately 0.45 miles long and includes concrete medians and a Reduced Conflict U-Turn (RCUT) intersection at Tech Parkway. To accommodate high pedestrian t

Project Information FAQ

Project Information

3 Q
The project “SR 3/US 19 FM CS 3498/MARIETTA STREET TO CS 3352/8TH STREET” is an infrastructure initiative in the Bridge sector, located in Atlanta, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project would construct a new Northside Drive to provide two northbound and two southbound travel lanes from south of Marietta Street to 8th Street with improved intersections at Marietta Street and Tech Parkway. The project is approximately 0.45 miles long and includes concrete medians and a Reduced Conflict U-Turn (RCUT) intersection at Tech Parkway. To accommodate high pedestrian traffic in the area, a 5-12 ft sidewalk is proposed throughout the project. The project removes the existing separated northbound and southbound Northside Drive. The project will construct a new Tech Parkway intersection that ties into Northside Drive at Hampton St. Walls will be included on the east side of the road between 8th St and 10th St. South of Marietta St the road ties back into the existing bridge. CR - 07/03/2024

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data