logo

SR 3/US 19 FROM I-75 SB RAMP TO S OF CS 137/HOLMES STREET

Construction work program · Georgia

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The proposed project implements a roadway enhancement on the I-75 overpass to diminish the existing roadway section to a single northbound lane, two southbound lanes and an additional northbound receiving lane north of the intersection for westbound right turns from I-75 northbound. The existing roadway sections south and north of the I-75 overpass along SR 3/Northside Drive from Holmes Street

Status
Under Construction
Sector
Rail, Bridge, Road, Cement, Car parking, Automotive
Location
Atlanta, Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 3/US 19 FROM I-75 SB RAMP TO S OF CS 137/HOLMES STREET

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “SR 3/US 19 FROM I-75 SB RAMP TO S OF CS 137/HOLMES STREET” is an infrastructure initiative in the Rail sector, located in Atlanta, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Not available for this record.

Status

Original status

construction work program

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project implements a roadway enhancement on the I-75 overpass to diminish the existing roadway section to a single northbound lane, two southbound lanes and an additional northbound receiving lane north of the intersection for westbound right turns from I-75 northbound. The existing roadway sections south and north of the I-75 overpass along SR 3/Northside Drive from Holmes Street to the I-75 northbound on/off ramp will be maintained. The project includes two concrete median and one flush median, both measuring 11 ft. in width. The project proposes sidewalks be widened to a width of 8 ft. to accommodate high pedestrian traffic in the area and the construction of new retaining walls on the west side of the roadway. The widening provides access across from the I-75 SB off ramp for existing businesses on the east side of Northside Drive. The project will tie back into existing before the railroad bridge. The length of the project is approximately 0.4 miles.

Location

Country

United States of America (USA)

State

Georgia

City

Atlanta

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Rail, Bridge, Road, Cement, Car parking, Automotive

Article published date

2026-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project