logo

SR 3/US 41 FM COBB CO LINE TO SR 293 CONN - MEDIAN TURN LNS

Sector: Power Transmission • Location: Cartersville, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

This project is a safety improvement located on SR 3/US 41 in Bartow County. The project begins approximately at the Cobb/Bartow County line and extends north to the SR 293 Connector in Bartow County. The proposed improvement will add turn lanes at twenty-seven intersections and ten median crossovers. Fourteen traffic signals will be installed as part of this project. The left turn lanes will

Project Information FAQ

Project Information

4 Q
The project “SR 3/US 41 FM COBB CO LINE TO SR 293 CONN - MEDIAN TURN LNS” is an infrastructure initiative in the Power Transmission sector, located in Cartersville, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project is a safety improvement located on SR 3/US 41 in Bartow County. The project begins approximately at the Cobb/Bartow County line and extends north to the SR 293 Connector in Bartow County. The proposed improvement will add turn lanes at twenty-seven intersections and ten median crossovers. Fourteen traffic signals will be installed as part of this project. The left turn lanes will improve safety along the corridor by constructing Type "B" median crossovers which will improve sight distance and reduce rear-end/sideswipe collisions by separating the turning vehicles from through traffic. Right turn lanes will be added at selected paved intersections provided that no additional right of way and/or utility relocations are required by the construction. The project length is 15.15 miles.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data