logo

SR 3/US 41 FROM I-285 WB RAMP TO CS 1782/SPRING ROAD

Sector: Road • Location: Smyrna, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

This project proposes to widen the I-285 WB exit ramp at SR 3/Cobb Pkwy to 3 left turn lanes and 3 right turn lanes. It also includes widening on Circle 75 Pkwy to 3 left turn lanes, a though lane and a shared through right turn lane.

Project Information FAQ

Project Information

4 Q
The project “SR 3/US 41 FROM I-285 WB RAMP TO CS 1782/SPRING ROAD” is an infrastructure initiative in the Road sector, located in Smyrna, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project proposes to widen the I-285 WB exit ramp at SR 3/Cobb Pkwy to 3 left turn lanes and 3 right turn lanes. It also includes widening on Circle 75 Pkwy to 3 left turn lanes, a though lane and a shared through right turn lane.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data