logo

SR 4 FM BAY ST TO MAIN ST & SR 23 FM MAGNOLIA ST TO MAIN ST

Sector: Water Supply and Storage • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

The project consists of improving the insufficient storm drain systems that allow excess water to pond on the existing roadways during significant rainfall events along SR 4/US 301 from CS 417/Bay Street to CS 462/Main Street & along SR 23 from CS 428/Magnolia Street to CS 462/Main Street within the Folkston city limits. To alleviate the problem, existing drainage structures will be replaced, & ad

Project Information FAQ

Project Information

4 Q
The project “SR 4 FM BAY ST TO MAIN ST & SR 23 FM MAGNOLIA ST TO MAIN ST” is an infrastructure initiative in the Water Supply and Storage sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists of improving the insufficient storm drain systems that allow excess water to pond on the existing roadways during significant rainfall events along SR 4/US 301 from CS 417/Bay Street to CS 462/Main Street & along SR 23 from CS 428/Magnolia Street to CS 462/Main Street within the Folkston city limits. To alleviate the problem, existing drainage structures will be replaced, & additional drainage structures will be added to capture more of the pavement drainage in order to reduce gutter spread. In addition, the existing longitudinal pipes will be replaced with larger pipes, & new pipes will be added to allow for a greater flow & storage capacity within the system. Each system will outfall at the existing outfall locations. The project length along SR 4/US 301 is approx. 0.53 miles from road inventory milepost 3.87 to road inventory milepost 4.24 & the project length along SR 23 is approx. 0.33 miles from road inventory MP 35.49 to road inventory MP 35.82.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data