logo

SR 400 @ CS 9284/WINDWARD PARKWAY

Sector: Road • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

The proposed project consists of improvements to the exit ramp for the northbound exit ramp located on S.R. 400 at Windward Parkway and along Windward Parkway. The project begins at the intersection of the S.R. 400 Northbound exit ramp and Windward Parkway and travels east along Windward Parkway to the intersection of Windward Parkway and North Point Parkway.

The project consists of adding a f

Status
Closed
Sector
Road, Government, Manufacturing (Industrial)
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 400 @ CS 9284/WINDWARD PARKWAY

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 400 @ CS 9284/WINDWARD PARKWAY” is an infrastructure initiative in the Road sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project consists of improvements to the exit ramp for the northbound exit ramp located on S.R. 400 at Windward Parkway and along Windward Parkway. The project begins at the intersection of the S.R. 400 Northbound exit ramp and Windward Parkway and travels east along Windward Parkway to the intersection of Windward Parkway and North Point Parkway. The project consists of adding a free flow right turn lane from the S.R. 400 northbound exit ramp onto Windward Parkway that would continue as an additional lane which would drop as a right turn lane at the North Point Parkway intersection. These improvements would significantly reduce congestion on the S.R. 400 northbound exit ramp and allow both the S.R. 400/Windward Parkway and Windward Parkway/North Point Parkway intersections to operate at an acceptable Level of Service with reduced delay over existing conditions.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Road, Government, Manufacturing (Industrial)

Article published date

2024-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project