SR 400 @ SR 140/HOLCOMB BRIDGE ROAD - SB EXIT RAMP
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
The major proposed improvement is increasing the width of the exit ramp from 16 feet to 36 feet by adding 20 feet of PCC pavement along the entire length of the right side to create two 12-foot-wide dedicated left-turn lanes and one 12-foot-wide dedicated right-turn lane. This addition would not only significantly increase the left-turning movement capacity but also increase the left-turning stora
- Status
- Closed
- Sector
- Automotive, Bridge, Road, Government, Manufacturing (Industrial)
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 400 @ SR 140/HOLCOMB BRIDGE ROAD - SB EXIT RAMP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The major proposed improvement is increasing the width of the exit ramp from 16 feet to 36 feet by adding 20 feet of PCC pavement along the entire length of the right side to create two 12-foot-wide dedicated left-turn lanes and one 12-foot-wide dedicated right-turn lane. This addition would not only significantly increase the left-turning movement capacity but also increase the left-turning storage capacity by approximately 50 vehicles and should, therefore, markedly increase the level of service. Additionally, the existing curb and gutter is proposed to be replaced by V gutter per current GDOT standards. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Automotive, Bridge, Road, Government, Manufacturing (Industrial) |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
