SR 400 @ SR 140/HOLCOMB BRIDGE ROAD - SB EXIT RAMP
Sector: Automotive • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The major proposed improvement is increasing the width of the exit ramp from 16 feet to 36 feet by adding 20 feet of PCC pavement along the entire length of the right side to create two 12-foot-wide dedicated left-turn lanes and one 12-foot-wide dedicated right-turn lane. This addition would not only significantly increase the left-turning movement capacity but also increase the left-turning stora
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The major proposed improvement is increasing the width of the exit ramp from 16 feet to 36 feet by adding 20 feet of PCC pavement along the entire length of the right side to create two 12-foot-wide dedicated left-turn lanes and one 12-foot-wide dedicated right-turn lane. This addition would not only significantly increase the left-turning movement capacity but also increase the left-turning storage capacity by approximately 50 vehicles and should, therefore, markedly increase the level of service. Additionally, the existing curb and gutter is proposed to be replaced by V gutter per current GDOT standards. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
