logo
ProjectConstruction Work Program

SR 404 SPUR/US 17 @ BACK RIVER

One of 10,000+ projects Taiyo tracks in Georgia.

Source: Georgia Department of Transportation (GDOT)

Located in Chatham County, Georgia and Jasper County, South Carolina, will add a new bridge adjacent to the existing bridge on SR 404 SPUR/US 17 over Back River into South Carolina, where South Carolina Department of Transportation is widening US 17 to four lanes. This project will begin at the southern end of the Back River Bridge and end at the full 4-lane section under cst by SCDOT Project ID 0

Status
Under Construction
Sector
Bridge, Seaport, Road
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 404 SPUR/US 17 @ BACK RIVER

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “SR 404 SPUR/US 17 @ BACK RIVER” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Not available for this record.

Status

Original status

construction work program

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Located in Chatham County, Georgia and Jasper County, South Carolina, will add a new bridge adjacent to the existing bridge on SR 404 SPUR/US 17 over Back River into South Carolina, where South Carolina Department of Transportation is widening US 17 to four lanes. This project will begin at the southern end of the Back River Bridge and end at the full 4-lane section under cst by SCDOT Project ID 0039168, approximately one-half mile north of the northern end of the Back River Bridge. Each bridge will be unidirectional and would carry two lanes. As part of this project, a portion of the northbound entrance ramp between Savannah Harbor Parkway and northbound US 17 will be reconstructed to replace the existing stop-controlled entrance with a parallel type entrance terminal to northbound US 17 on the new Back River bridge. The Georgia/South Carolina state line is approximately 850 ft. south of the end of the existing Back River bridge. The project length is 1.277 miles.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Bridge, Seaport, Road

Article published date

2026-04-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project