SR 42 @ 9 LOCS & SR 154 @ CS 2099/FLAT SHOALS AVE IN FULTON
Sector: Government • Location: Atlanta, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The proposed signal upgrade project would consist of a complete signal upgrade with pedestrian accommodation for every intersection. This would bring these intersection up to ADA requirements and replace old signal parts in place.
The following intersections are in this project:
1.) SR 154 @ Flat Shoals Ave 2.) SR 42 @ Wyle St 3.) SR 42 @ H Williams/Boulevard Dr 4.) SR 42 @ Hardee St 5.)
- Status
- Under Construction
- Sector
- Government, Residential
- Location
- Atlanta, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 42 @ 9 LOCS & SR 154 @ CS 2099/FLAT SHOALS AVE IN FULTON
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed signal upgrade project would consist of a complete signal upgrade with pedestrian accommodation for every intersection. This would bring these intersection up to ADA requirements and replace old signal parts in place. The following intersections are in this project: 1.) SR 154 @ Flat Shoals Ave 2.) SR 42 @ Wyle St 3.) SR 42 @ H Williams/Boulevard Dr 4.) SR 42 @ Hardee St 5.) SR 42 @ Edgewood Retail District Dwy 6.) SR 42 @ Caroline St/Seaboard Ave 7.) SR 42 @ Mansfield Ave 8.) SR 42 @ Freedom Pkwy 9.) SR 42 @ North Ave 10.) SR 42/Briarcliff Rd @ St.Charles Pl |
Location
Country | United States of America (USA) |
State | Georgia |
City | Atlanta |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Government, Residential |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- CR 210/GLYEN HICKMAN RD FROM SR 117 TO CR 356/AIRPORT RD-TIA
- COLUMBUS VIADUCT RAILROAD BRIDGES.
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SIGNAL COMMUNICATIONS; SERVICE & SUPPORT - FY 2018
