logo

SR 42 SPUR @ NS #718064Y 0.30 MI E OF SR 54

Sector: Automotive • Location: Atlanta, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

This bridge (Structure ID 121-0051-0; SR 42 Spur over Norfolk-Southern RR) was built in 1924. The bridge consists of four spans of reinforced concrete deck girders on concrete columns and concrete caps. The design vehicle used for this bridge is below the current standards. The overall condition of this bridge would be classified as poor to fair. The deck is in fair condition due to concrete c

Project Information FAQ

Project Information

4 Q
The project “SR 42 SPUR @ NS 718064Y 0.30 MI E OF SR 54” is an infrastructure initiative in the Automotive sector, located in Atlanta, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This bridge (Structure ID 121-0051-0; SR 42 Spur over Norfolk-Southern RR) was built in 1924. The bridge consists of four spans of reinforced concrete deck girders on concrete columns and concrete caps. The design vehicle used for this bridge is below the current standards. The overall condition of this bridge would be classified as poor to fair. The deck is in fair condition due to concrete cracking, spalling and the presents of efflorescence throughout. The superstructure is in poor condition with advanced concrete spalls, delamination and section loss in the reinforcing steel. One sidewalk and approximately eight feet of roadway are closed to traffic due to the section loss and spalls. The substructure is in fair condition with concrete cracking and spalls. Due to structural integrity of all components of this bridge, replacement is recommended.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data