SR 43 @ LLOYD CREEK 7 MI SW OF LINCOLNTON
Sector: Cement • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The bridge (Structure ID 181-0001-0; SR 43 over Lloyd Creek) was built in 1953 and is listed in fair condition. The bridge consists of three spans of four concrete Tee Beams on reinforced concrete caps and piles with spread footings. The bridge was designed using an H-15 design vehicle and the calculated load carrying capacity is 66.7 percent lower than current standards. The barrier is showing si
- Status
- Under Construction
- Sector
- Cement, Bridge, Automotive, Steel, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 43 @ LLOYD CREEK 7 MI SW OF LINCOLNTON
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The bridge (Structure ID 181-0001-0; SR 43 over Lloyd Creek) was built in 1953 and is listed in fair condition. The bridge consists of three spans of four concrete Tee Beams on reinforced concrete caps and piles with spread footings. The bridge was designed using an H-15 design vehicle and the calculated load carrying capacity is 66.7 percent lower than current standards. The barrier is showing signs of deterioration and is not MASH compliant. All spans have shrinkage cracks and abrasion wear and spans 1 and 3 also have longitudinal cracking. The edge beams at bents 2 and 3 have cracking, spalling, and exposed rebar. Scaling is present on the bottom of the deck and curbs. There is vertical cracking in the bearing areas at span1 beams 1, 2, and 4. There is shear cracking present at beam 3 and scaling on the beams and end walls. Both abutment caps have vertical cracking and spalling in the caps at bents 2 and 3. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Cement, Bridge, Automotive, Steel, Government |
Article published date | 2026-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs