logo

SR 43 @ SOAP CREEK 4 MI E OF LINCOLNTON

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

The proposed project is the replacement of the existing bridge located on SR 43 over Soap Creek at Lake Thurmond approximately 4 miles East of Lincolnton, Georgia. The existing bridge needs replacement due to the previously listed structural issues. The U. S. Army Corp of Engineers has requested that the bridge be raised an additional 8 to 9 feet above the existing bridge in order to allow suff

Project Information FAQ

Project Information

4 Q
The project “SR 43 @ SOAP CREEK 4 MI E OF LINCOLNTON” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project is the replacement of the existing bridge located on SR 43 over Soap Creek at Lake Thurmond approximately 4 miles East of Lincolnton, Georgia. The existing bridge needs replacement due to the previously listed structural issues. The U. S. Army Corp of Engineers has requested that the bridge be raised an additional 8 to 9 feet above the existing bridge in order to allow sufficient clearance for most pontoon boats to pass safely under the bridge when the lake is at full pool. The current bridge will be replaced with a 223 foot long by 40 foot wide bridge that follows the same alignment but with the profile being raised 8 feet above the existing bridge. The proposed approaches will consist of two-12 foot travel lanes and 8 foot rural shoulders with 2 foot paved. The proposed length of project is 0.56 miles. Traffic will be maintained by using an 8.3 mile off-site detour during construction.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data