SR 44 FROM CAREY STATION ROAD TO S OF KING DRIVE - PHASE II
Construction work program · Georgia
Source: Georgia Department of Transportation (GDOT)
Reconstruction/rehab project located on SR 44 in Greene County. The project begins north of the intersection of Carey Station Rd & continues for approximately 3.74-miles before terminating approximately ¾ of a mile south of King Dr. The project will widen SR 44 to a four-lane section consisting of 12-ft outside lanes & 11-ft inside lanes, a 32-ft depressed median & a bike lane on the 6.5-ft paved
- Status
- Under Construction
- Sector
- Bridge, Road
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 44 FROM CAREY STATION ROAD TO S OF KING DRIVE - PHASE II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Reconstruction/rehab project located on SR 44 in Greene County. The project begins north of the intersection of Carey Station Rd & continues for approximately 3.74-miles before terminating approximately ¾ of a mile south of King Dr. The project will widen SR 44 to a four-lane section consisting of 12-ft outside lanes & 11-ft inside lanes, a 32-ft depressed median & a bike lane on the 6.5-ft paved shoulder. A new roundabout will be constructed at the intersection of State Route 44 with Richland Connector. The existing 144.35-ft long bridge on SR 44 over Richland Creek will be widened to 101.25-ft. The existing double 8-ft x 8-ft box culvert over Little Creek will be replaced with two 120-ft x 38.25-ft bridges separated by a 32-ft depressed median. This project will be the 2nd of three successive SR 44 widening projects to be constructed & will tie into the improvements provided by PI 0019696. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Bridge, Road |
Article published date | 2026-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- Centennial Bridge
- Claflin University Connecting Minority Community Project
- ConnectMaine Authority Statewide Broadband Infrastructure Application 2021
- White Earth NTIA Broadband – White Earth Reservation
- Tri-State Fiber Deployment Project (TSFDP)
- OLLU Connecting Minority Communities Pilot
- Strengthening Broadband Capacity to Amplify Educational Opportunities and Foster Digital Inclusion in Rural and Underserved Communities
- Connecting Minds & Technology: Enhancing Cross-Campus Digital Literacy with Hands-on Initiatives (CMT)
