logo

SR 44 FROM HARMONY/OLD PHOENIX RD TO CAREY STATION-PHASE III

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

PI No. 0006253 is a reconstruction/rehabilitation project located on State Route 44 in Putnam and Greene Counties. The project begins just south of Harmony Road/Old Phoenix Road and continues for approximately 5.27-miles before terminating just east of Carey Station Road. The project will widen SR 44 to a four-lane section with urban shoulders, consisting of two 11-foot lanes in each direction, a

Status
Under Construction
Sector
Bridge, Manufacturing (Industrial), Road, Car parking, Automotive, Government
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 44 FROM HARMONY/OLD PHOENIX RD TO CAREY STATION-PHASE III

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 44 FROM HARMONY/OLD PHOENIX RD TO CAREY STATION-PHASE III” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

construction work program

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

PI No. 0006253 is a reconstruction/rehabilitation project located on State Route 44 in Putnam and Greene Counties. The project begins just south of Harmony Road/Old Phoenix Road and continues for approximately 5.27-miles before terminating just east of Carey Station Road. The project will widen SR 44 to a four-lane section with urban shoulders, consisting of two 11-foot lanes in each direction, a 16-foot raised median, sidewalk, and 4-foot bike lanes. The existing 454-ft long bridge along SR 44 over Oconee River will be widened to 85’-5”. The existing signal at Harmony Road/Old Phoenix Road will be replaced. The four existing signals at Scott Road, Merchant Street, Linger Longer Road, and Carey Station Road will be converted to roundabouts. Two additional roundabouts will be added at Harmony Plaza and Carriage Lane. This project will be the third of three successive State Route 44 widening projects to be constructed and will tie into the improvements provided by PI 0019697.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Bridge, Manufacturing (Industrial), Road, Car parking, Automotive, Government

Article published date

2026-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project