SR 47 FM SR 43 CONN TO .5 NW OF CR 80-TWO PASSING LANES-TIA
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
This project will construct a westbound passing lane and an eastbound climbing lane on State Route 47. The project begins at Milepost 10.33 and ends at Milepost 7.85. For the passing lane, the typical section consists of one 12' lane in each direction and one 12' westbound passing lane. For the climbing lane, the typical section consists of one 12' lane in each direction and one 12' eastbound cl
- Status
- Closed
- Sector
- Power Transmission, Road, Government, Power Generation (CCGT)
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 47 FM SR 43 CONN TO .5 NW OF CR 80-TWO PASSING LANES-TIA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will construct a westbound passing lane and an eastbound climbing lane on State Route 47. The project begins at Milepost 10.33 and ends at Milepost 7.85. For the passing lane, the typical section consists of one 12' lane in each direction and one 12' westbound passing lane. For the climbing lane, the typical section consists of one 12' lane in each direction and one 12' eastbound climbing lane. During construction, traffic will be maintained utilizing on-site detours. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Road, Government, Power Generation (CCGT) |
Article published date | 2024-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
