logo

SR 47 NB MP 8.33-9.53;SB AND NB 13.48 - 15.18

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

This project consists of the construction of two passing lanes on State Route 47 north and south of Appling. Passing lane No. 1 consists of two 12' travel lanes in each direction separated by a 4' flush median beginning at mile post 15.07 and ending at mile post 13.40. Included on this passing lane is the realignment of Lonergan-Hulme Road (CR 285) and also the installation of a Traffic Signal a

Project Information FAQ

Project Information

4 Q
The project “SR 47 NB MP 8.33-9.53;SB AND NB 13.48 - 15.18” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project consists of the construction of two passing lanes on State Route 47 north and south of Appling. Passing lane No. 1 consists of two 12' travel lanes in each direction separated by a 4' flush median beginning at mile post 15.07 and ending at mile post 13.40. Included on this passing lane is the realignment of Lonergan-Hulme Road (CR 285) and also the installation of a Traffic Signal at the intersection of State Route 47 and State Route 232. The shoulders consist of 10' rural shoulders of which 4' will be paved. Traffic will be maintained on existing lanes during construction. Passing lane No. 2 consists of one - 12' northbound travel lane and two 12' southbound travel lanes with 10' rural shoulders of which 4' will be paved from mile post 7.98 to 6.75. Traffic will be detoured on this portion of the project to replace an existing triple 10' x 10' bridge culvert. Traffic will be detoured along County Road 986 and State Route 150 during construction.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data