logo

SR 49 FM JUST W. OF FELTON RD TO EAST OF MILLEDGEVILLE BYP

Sector: Bridge • Location: Milledgeville, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

This project consists of the widening and reconstruction of State Route 49 from Milepost 7.1, just west of Felton Drive and ending at Milepost 9.9, just east of the bridge over Fishing Creek from a two-lane facility to a four lane facility with a 14' flush median. The proposed typical sectionconsists of two 12' travel lanes in each direction with a 14' flush median with 10' shoulders (4' of which

Project Information FAQ

Project Information

3 Q
The project “SR 49 FM JUST W. OF FELTON RD TO EAST OF MILLEDGEVILLE BYP” is an infrastructure initiative in the Bridge sector, located in Milledgeville, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project consists of the widening and reconstruction of State Route 49 from Milepost 7.1, just west of Felton Drive and ending at Milepost 9.9, just east of the bridge over Fishing Creek from a two-lane facility to a four lane facility with a 14' flush median. The proposed typical sectionconsists of two 12' travel lanes in each direction with a 14' flush median with 10' shoulders (4' of which is paved) from the beginning of the project to Blandy Road. From Blandy Road to the end of the project,, the typical section would consist of two 12' lanes in each direction with a 14' flush median with curb, gutter, and sidewalk. Dedicated left and right turn lanes will be provided where warranted. A traffic signal will be installed at the intersection of SR 49 and Blandy Road. Sidewalk will also be installed on the south side of the existing Fishing Creek bridge.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data