SR 5 CONN @ I-575 & @ CR 4661/MALL BLVD
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
This project consists of intersection improvements along Barrett Parkway at the I-575 NB and SB ramps and Mall Boulevard. At the intersection of Barrett Pkwy and the I-575 NB ramp, an additional left-turn lane will be provided to create dual left-turn lanes on the EB leg of Barrett Pkwy to serve traffic heading to I-575 NB. At the intersection of Barrett Pkwy and the I-575 SB ramp, an additional
- Status
- Closed
- Sector
- Car parking, Residential, Road, Government, Automotive, Manufacturing (Industrial)
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 5 CONN @ I-575 & @ CR 4661/MALL BLVD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of intersection improvements along Barrett Parkway at the I-575 NB and SB ramps and Mall Boulevard. At the intersection of Barrett Pkwy and the I-575 NB ramp, an additional left-turn lane will be provided to create dual left-turn lanes on the EB leg of Barrett Pkwy to serve traffic heading to I-575 NB. At the intersection of Barrett Pkwy and the I-575 SB ramp, an additional left turn lane will be provided to create dual left-turn lanes on the WB leg of Barrett Pkwy to serve traffic heading to I-575 SB. At the intersection of Barrett Pkwy and Mall Blvd, an additional SB left-turn lane will be provided on the SB leg of Mall Blvd; new sidewalks will also be provided along both sides of Mall Blvd. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Residential, Road, Government, Automotive, Manufacturing (Industrial) |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
