logo

SR 5 SPUR @ SANDY PLAINS ROAD

Sector: Road • Location: Marietta, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The proposed improvement would provide dual right turn lanes approximately 485 ft in length on SR 5 for the eastbound approach. The additional right turn lane would require widening along the south side of the eastbound approach. The eastbound right turn angle would also be improved to provide a safer right turning radius onto Sandy Plains Road from SR 5/Canton Rd Conn. The safer right turn angle

Project Information FAQ

Project Information

4 Q
The project “SR 5 SPUR @ SANDY PLAINS ROAD” is an infrastructure initiative in the Road sector, located in Marietta, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed improvement would provide dual right turn lanes approximately 485 ft in length on SR 5 for the eastbound approach. The additional right turn lane would require widening along the south side of the eastbound approach. The eastbound right turn angle would also be improved to provide a safer right turning radius onto Sandy Plains Road from SR 5/Canton Rd Conn. The safer right turn angle will require vehicles to slow down and improve driver visibility of pedestrians and other motorists. Upon completion, the dual eastbound right turn lanes would require adjustments to the existing island, signal and utility poles and signal cabinet in the southwest quadrant of the intersection. Providing dual right turn lanes on the eastbound approach will significantly reduce the queuing and spillback observed in both the AM and PM peak periods.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data