SR 520 Bridge Replacement

Sector: Automotive • Location: World

Source: Road Traffic Technology

Project
Closed

Testing draw span of the floating bridge. Inspection of the SR 520 floating bridge by the WSDOT team. Pile driving works at the pontoons construction site. Site draining / dewatering the site. The 75ft-long piles, which provide foundation for the pontoon casting basin. The first pile of the 900 piles being driven for the construction of casting basin at Aberdeen. The SR 520 floating bridge is a tw

Project Information FAQ

Project Information

4 Q
The project “SR 520 Bridge Replacement” is an infrastructure initiative in the Automotive sector, located in World. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Testing draw span of the floating bridge. Inspection of the SR 520 floating bridge by the WSDOT team. Pile driving works at the pontoons construction site. Site draining / dewatering the site. The 75ft-long piles, which provide foundation for the pontoon casting basin. The first pile of the 900 piles being driven for the construction of casting basin at Aberdeen. The SR 520 floating bridge is a two-lane floating bridge that spans from interstate highway I-5 in Seattle to state route highway SR 202 in Redmond, Washington, US. Officially known as the Governor Albert D Rosellini Bridge, it was opened in 1966. It was earlier known as the Evergreen Point Bridge. The existing floating bridge and the connecting Portage Bay Bridge and Union Bay Bridge are supported by hollow columns, which are vulnerable to severe storms and earthquakes. During a heavy storm or a 50mph wind, the waves of the lake beating against the southern wall of the bridge may lead to the breakage of the pontoons and anchor cables. It may further cause the bridge to sink or collapse. Moreover, the existing bridge does not meet the modern earthquake design standards. The floating bridge has therefore been decided to be replaced and the connecting bridges improved in order to make them safer and more reliable. Approximately 115,000 vehicles pass through the floating bridge each day, which is more than the estimated 65,000 for which it was designed. The connecting bridges are also improved. The new replacing bridge pontoons have the ability to tolerate up to 92mph of wind. The replacement provides a new west approach to the bridge to withstand a 1,000-year earthquake event. In addition, the new bridge reduces travel times and makes the journey easier for people crossing Lake Washington. Construction of the floating bridge began in 2012 and the bridge was opened to traffic in April 2016. The floating bridge replacement is part of the SR 520 Bridge Replacement and HOV Program which aims to replace the SR 520 floating bridge and improve the Portage Bay Bridge and approach roads in the corridor. Improving 12.8 miles of the corridor, the programme is estimated to cost $4.128bn. It is divided into three main components, namely I-5 to Medina, Medina to SR 202 and Pontoon construction project. The I-5 to Medina section witnessed the replacement of the SR520 floating bridge, interchanges and roadway between I-5 and the eastern shore of Lake Washington. The Medina to SR 202 section improved the 8.8-mile high-occupancy vehicle (HOV) line from Evergreen Point Road in Medina to the SR 202 interchange in Redmond. It was carried out under a project termed the Eastside Transit and HOV Project. The pontoon construction involved building large pontoon structures for use in the replacement of the floating bridge in the event of failure. The pontoons were built early as their construction takes a long time, which could delay the bridge restoration upon catastrophic failure. The final environmental impact statement for the floating bridge replacement project was released in 2011. The Lake Washington project included the replacement of 15 of the 52 anchor cables on the Hadley floating bridge and the replacement of 15 of the 58 cables on the SR 520. The cables help bridges withstand storms and waves. The unreplaced cables were evaluated every two years till the completion of the construction. The pontoons were cast in a facility that was built in a 55-acre site in Aberdeen. Construction of the facility began in February 2011. The works included the construction of a 900ft-long and 200ft-wide casting basin, 33 pontoons and ten smaller stability pontoons on the shores of Gray’s Harbour. The pontoons were floated towards Lake Washington and then used for the construction of the bridge. A total of 12 pontoons were floated from Aberdeen and Tacoma in July 2012. As of September 2012, five new pontoons have reached Lake Washington. The pontoon construction was completed in the first quarter of 2014. The existing floating bridge has a width of 60ft. It is supported by 33 pontoons, which are 360ft-long and 16ft-tall. It is also supported by 62 anchors, which weigh around 77t each. The new SR 520 has a width of 115ft and the new pontoons are 28ft-tall, 75ft-wide and 360ft-long. The bridge height above the water level was increased from the current 13ft to 20ft. The new replacement bridge was designed to include a six-lane bidirectional highway that includes two lanes for general traffic and a new transit / HOV lane in each direction. A 14ft-wide bicycle and pedestrian path were built on the north side of the bridge. The shoulders are designed to be wider so that vehicles can be pulled over in the event of breakdown of the bridge. Khe Kiewit-General joint consortium won the $367.3m contract for the SR 520 pontoons construction. The $586.6m contract for the floating bridge construction was awarded in August 2011 to the Keiwit-General-Manson joint venture (JV). The three contractors shortlisted for the construction of the floating bridge were SR 520 Corridor Constructors, Flatiron-Skanska-Traylor Brothers and Keiwit-General-Manson. Of the total programme cost, around $2.6bn were secured through state and federal funding and tolls collected on the floating bridge. The funds are sufficient for the Eastside HOV improvements, pontoon constructions and the SR 520 floating bridge. In October 2012, the Washington State Department of Transportation (WSDOT) granted a $300m federal loan for the west side bridge between the floating bridge and Montlake.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data