logo

SR 520 FROM I-185/MUSCOGEE TO SR 26/MP 8.51/CHATTAHOOCHEE

Sector: Rail • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

This safety project consists of the installation of double faced guardrail in the median of State Route 520 from I-185 to State Route 26. Guardrail on the outside shoulder will be removed, replaced and extended if needed. Several existing median openings will be reconstructed as Type "A" crossovers. State Route 26 will be realigned to form a 90 degree intersection with State Route 520. Existin

Project Information FAQ

Project Information

4 Q
The project “SR 520 FROM I-185/MUSCOGEE TO SR 26/MP 8.51/CHATTAHOOCHEE” is an infrastructure initiative in the Rail sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This safety project consists of the installation of double faced guardrail in the median of State Route 520 from I-185 to State Route 26. Guardrail on the outside shoulder will be removed, replaced and extended if needed. Several existing median openings will be reconstructed as Type "A" crossovers. State Route 26 will be realigned to form a 90 degree intersection with State Route 520. Existing lane and paved shoulder widths will not change, although right turn lanes will be added at several side streets. The addition of guardrail in the median is intended to reduce or eliminate crossover accidents. Upgrades to guardrail on the outside shoulder are needed to bring the rail up to current standards.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data