logo

SR 520 New Trail Grade Separation at NE 51st St

Sector: Bridge • Location: Redmond, Washington, United States of America

Source: Dodge USA

Project
Pre-Design

Construct a grade-separated pedestrian and bike tunnel for the SR 520 regional shared use path under the NE 51st Street and SR 520 westbound ramp terminal intersection.

Status
Prospective
Sector
Bridge, Road, Tunnel, Mass Transit, Government, Rail, Commercial
Location
Redmond, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about SR 520 New Trail Grade Separation at NE 51st St

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 520 New Trail Grade Separation at NE 51st St” is an infrastructure initiative in the Bridge sector, located in Redmond, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construct a grade-separated pedestrian and bike tunnel for the SR 520 regional shared use path under the NE 51st Street and SR 520 westbound ramp terminal intersection.

Budget

Location

Country

United States of America (USA)

State

Washington

City

Redmond

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Road, Tunnel, Mass Transit, Government, Rail, Commercial

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project