SR 520BU FROM SR 91 TO CS 905/THORNTON DRIVE
Construction work program · Georgia
Source: Georgia Department of Transportation (GDOT)
The approved project concept consists of improvements on SR 520 Business from Washington Street (MP 4.45) to Thornton Drive (MP 7.08), for a distance of 2.63 mi. The proposed improvements include widening from four, 12’ (2 in each direction) to six, 12’ lanes (three in each direction), and the addition of bike lanes, sidewalks, and a raised median.
- Status
- Under Construction
- Sector
- Car parking, Road, Government, Automotive, Manufacturing (Industrial)
- Location
- Albany, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 520BU FROM SR 91 TO CS 905/THORNTON DRIVE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The approved project concept consists of improvements on SR 520 Business from Washington Street (MP 4.45) to Thornton Drive (MP 7.08), for a distance of 2.63 mi. The proposed improvements include widening from four, 12’ (2 in each direction) to six, 12’ lanes (three in each direction), and the addition of bike lanes, sidewalks, and a raised median. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Albany |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Government, Automotive, Manufacturing (Industrial) |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
