logo

SR 520/US 27 @ FIRST DIVISION ROAD 7.5 MI NW OF CUSSETA

Sector: Bridge • Location: Cusseta-Chattahoochee County, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

Located in the Fort Benning Military Base, 7.5 miles northwest of the City of Cusseta in Chattahoochee County, Georgia, this project replaces the existing substandard 210’x 27.9’ bridge on First Division Road over SR 520/ US 27/US 280 with a new 230’ x 35.08’ bridge. The project begins approximately 500-feet south and ends approximately 500 feet north of the existing bridge for a total project len

Status
Under Construction
Sector
Bridge, Cement, Road, Government
Location
Cusseta-Chattahoochee County, Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 520/US 27 @ FIRST DIVISION ROAD 7.5 MI NW OF CUSSETA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 520/US 27 @ FIRST DIVISION ROAD 7.5 MI NW OF CUSSETA” is an infrastructure initiative in the Bridge sector, located in Cusseta-Chattahoochee County, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

construction work program

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Located in the Fort Benning Military Base, 7.5 miles northwest of the City of Cusseta in Chattahoochee County, Georgia, this project replaces the existing substandard 210’x 27.9’ bridge on First Division Road over SR 520/ US 27/US 280 with a new 230’ x 35.08’ bridge. The project begins approximately 500-feet south and ends approximately 500 feet north of the existing bridge for a total project length of 0.3 miles. Existing guardrail and concrete barrier along SR 520/US 27/US 280 near the existing bridge on both sides will be impacted and replaced during construction together with shoulder pavement. The proposed First Division Road typical section will consist of one 12-foot travel lane and a 6-foot outside shoulder (4-foot paved) in each direction. Traffic will be maintained on an off-site detour during construction of new bridge with a total bypass length of 3.3 miles.

Location

Country

United States of America (USA)

State

Georgia

City

Cusseta-Chattahoochee County

Source

Source reliability

High

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Bridge, Cement, Road, Government

Article published date

2024-01-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project