logo

SR 526 Resurfacing Project from Mills Ave to Maguire Blvd/Crystal Lake Dr

Sector: Car parking • Location: Orlando, Florida, United States of America (USA)

Source: Florida Department of Transportation (FDOT)

Project
Ongoing

The purpose of this project is to make corridor improvements along Robinson Street (State Road (S.R.) 526) from Mills Avenue (S.R. 15) to Maguire Boulevard/North Crystal Lake Drive in Orlando to enhance safety and efficiency. The project will make changes to the roadway configuration to encourage slower speeds and improve accommodations for pedestrians. The corridor will have one travel lane in ea

Project Information FAQ

Project Information

5 Q
The project “SR 526 Resurfacing Project from Mills Ave to Maguire Blvd/Crystal Lake Dr” is an infrastructure initiative in the Car parking sector, located in Orlando, Florida, United States of America (USA). Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The purpose of this project is to make corridor improvements along Robinson Street (State Road (S.R.) 526) from Mills Avenue (S.R. 15) to Maguire Boulevard/North Crystal Lake Drive in Orlando to enhance safety and efficiency. The project will make changes to the roadway configuration to encourage slower speeds and improve accommodations for pedestrians. The corridor will have one travel lane in each direction, separated by a center two-way left turn lane between Mills Avenue and Hampton Avenue. Raised medians with openings for left turns will be constructed between Hampton Avenue and Festival Way. The entire corridor will be repaved. On-street parking areas will be provided on westbound Robinson Street between Altaloma Avenue and Hampton Avenue. There will be some on-street parking on eastbound Robinson Street near Primrose Drive and near Festival Way.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data